Rubberized Roof Sealant Removal and Replacement, Fort Devens

Department
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed

Summary

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA is seeking Rubberized Roof Sealant Removal and Replacement, Fort Devens. Amendment 0001: The purpose of this amendment is to extend the response due date from 12PM EST 2 July 2026 to 4PM EST 8 July 2026 and answer vendors' questions. Location: MA.

Full Description

Amendment 0001: The purpose of this amendment is to extend the response due date from 12PM EST 2 July 2026 to 4PM EST 8 July 2026 and answer vendors' questions. ItemCritical Project ParameterDetail / Requirement Project Name Rubberized Roof Sealant Removal and ReplacementBuilding 3574, Devens Reserve Forces Training Area (RFTA), Devens, MA Solicitation No. W15QKN26QA132Request for Proposal (RFP) Contract Type Firm-Fixed-Price (FFP)Single-award commercial construction services contract. Set-Aside Status 100% Service-Disabled Veteran-Owned Small Business (SDVOSB)NAICS: 238160 (Roofing Contractors) | Size Standard: $19.0M Bonding / Security Waived Pre-award bid guarantees, post-award performance and payment bonds (SF 25/SF 25A), and alternative payment protections are  not required . Period of Performance 20 Working DaysThe performance period begins after the issuance of the Notice to Proceed (NTP). Mandatory Labor Rates Davis-Bacon Act Prevailing WagesMiddlesex County Wage Determination MA20260001 (issued May 18, 2026). Questions Deadline June 30, 2026, at 12:00 PM EST Submitted in writing via email to the Contract Specialist and Contracting Officer. Proposal Deadline July 02, 2026, at 12:00 PM EST 100% Electronic Submission via Email to the Contract Specialist. Primary Contact (CS) Nelia Shyshak, Contract Specialistnelia.shyshak.civ@army.mil Summary of What the Contractor Shall Provide To be deemed technically acceptable and responsive, the successful contractor must deliver the physical services and technical deliverables detailed below: Physical Construction & Specialty Trade Services: Sealant Removal:  Complete removal of the existing failed under-eave rubberized sealant on Building 3574. Surface Preparation:  Prepare the exposed surface to ensure it is completely dry, clean, and free of residues. The Government reserves the right to inspect the surface prior to new installation. Sealant Installation:  Provide and install new commercial-grade sealant, ensuring uniform application over the designated 270 to 300 square foot under-eave perimeter. General Scope:  The Contractor shall provide all plant, labor, equipment (including scissor lift), tools, materials, supervision, and transportation necessary to accomplish the work. Mandatory Technical Submittals & Deliverables (Within 10 business days of NTP): Rubberized Roof Sealant Replacement Plan Warranty Management Plan Manufacturer's Instructions Operations and Maintenance Data Completed Cost Breakdown Form (Attachment 0003):  An itemized breakdown specifying direct labor (compliant with the specified Wage Determination), materials/equipment, and a separate calculation for Overhead/G&A and Profit. Mandatory Site Visit & Access Prospective offerors are highly encouraged to inspect the site. Failure to do so will not constitute grounds for a claim after award. Site Visit Schedule: Primary Site Visit:  Tuesday, June 25, 2026, at 9:00 AM EST Secondary Site Visit:  Wednesday, June 26, 2026, at 9:00 AM EST Site Visit Address:  Building 3574, Devens RFTA, Main Cantonment Area, Devens, MA 01434. Access Pass Security (Mandatory 48-Hour Advance Notice): Attendees must submit the "Devens Visitors Pass" request form at least  forty-eight (48) hours prior  to the scheduled site visit date and time. Zygmunt Osiecki, DPW Director  | Email: zygmunt.v.osiecki.civ@army.mil | Phone: (978) 615-6104 Post-Award Contract Execution Sequence Contract performance shall follow this strict chronological sequence. Physical mobilization, tool delivery, or actual onsite work is strictly prohibited prior to receiving the written Notice to Proceed (NTP). Contract Award:  The Government executes and issues the FFP contract in the Army Contract Writing System (ACWS). Notice to Proceed (NTP) Issuance:  Upon contract execution, the Contracting Officer issues the formal NTP, which officially starts the 20-working-day Period of Performance (PoP) clock. Required Submittals:  Within ten (10) business days following NTP, the Contractor shall submit all required technical documents for Government review and approval. Pre-Construction Conference:  After NTP issuance but prior to starting work, a conference will be held to review base access and safety. Onsite Work Commencement:  The Contractor may begin physical onsite work only after submittals are approved and the pre-construction conference is complete.

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Who won similar contracts

Recent government contract awards from the same buyer or for similar work. Public records from open.canada.ca, SAM.gov, and USAspending.gov.

A similar contract went to STORIJ INC for $2,520,255 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICAR408

A similar contract went to BARBOUR STOCKWELL, INC. for $440,750 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA6636

A similar contract went to FN AMERICA LLC in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICA

A similar contract went to IRIS ENTERPRISE SOLUTIONS, LLC in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-NJ.W6QK ACC-PICAU099

Browse all recent awards →