W--Super-Silent 56kW Generator Rental & Installation
Department
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000)
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Industries
Summary
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000) is seeking W--Super-Silent 56kW Generator Rental & Installation. Super-Silent 56kW Generator Rental including Installation and Utility Connection at Mount Rushmore National Memorial, Keystone, South Dakota The purpose of this amendment (0001) is to provide answers . Location: SD.
Full Description
Super-Silent 56kW Generator Rental including Installation and Utility Connection at Mount Rushmore National Memorial, Keystone, South Dakota The purpose of this amendment (0001) is to provide answers to questions asked thus far and two additional attachments - location map and trailer electrical requirements. Q1. Please confirm the expected generator operating schedule during the June 24, 2026, through July 7, 2026, period. Should the contractor assume continuous 24/7 operation, daily event/business-hour operation, or another defined operating schedule? A1. At most 14 hours per day with at least 16 hours run times on the 2nd, 3rd, and 4th. Q2. Please confirm the intended connection point for each trailer. Will the contractor connect to existing trailer panels, receptacles, disconnects, or another Government-provided connection point? A2. Existing Trailer Panels Q3. Please provide the approximate distance between the proposed generator placement area and each trailer, including whether temporary cables are expected to cross pedestrian-accessible areas. A3. Approximately 50 foot or less from each trailer to generator. Cables will run through a parking lot area Q4. Please confirm whether there is a specific maximum acceptable noise level in dB(A), including the measurement distance, or whether a manufacturer-rated super-silent / whisper-rated sound-attenuated generator is acceptable. A4. Manufacturer-rated super-silent / whisper-rated sound-attenuated generator is acceptable. Q5. Please confirm whether fuel/refueling should be priced for the full period of performance and whether there are any site access restrictions or preferred refueling windows. A5. Refueling can occur any day other than July 2nd, 3rd, and 4th Q6. Please confirm whether the Government will provide known utility information or utility locating support prior to any grounding rod installation or ground penetration. A6. Government will provide Information upon request Q7. Please confirm whether the attached Technical Questionnaire is the correct questionnaire for this solicitation, as the title appears to reference a different project, while the solicitation number shown is 140P6026Q0050. A7. The title/heading is in error, but the questions are correct. Q9. Please provide the electrical specifications for each of the two mobile trailers including voltage (120V/240V), phase (single or three-phase), amperage rating, panel size, and estimated total load in kilowatts. This is required to verify generator compatibility and select appropriate distribution equipment. Would this be available at pre-bid site visit? A9. Please see attached document for electrical requirements Q10. Will the government provide a site plan or sketch showing the approximate generator placement area, cable routing to each trailer, and proximity to pedestrian pathways? Are there known underground utilities in the grounding rod installation area, and what is the process for utility locating at this National Park Service (NPS) site? If not, is a pre-bid site visit available before the June 5 deadline? A10. See attached document for approximate location. Exact placement is unknown but will be in the Red box. Underground utilities are unknown. Contractors must call 811 or fill out a utility-locate ticket online at least two business days before starting any digging project in South Dakota. Q11. The SOW requires certain item submittals 15 days prior to mobilization (June 9, 2026), but the quote deadline is June 5. Please confirm: does the 15-day submittal requirement still apply post-award? A11. Award is anticipated by June 9, 2026. Submittal requirement changed from 15 days to no less than 8 days prior to mobilization. Q12. What are the required hours of generator operation during the June 24 ¿ July 7 period of performance? (24/7, daytime only, or event-driven hours?) This directly affects fuel consumption and maintenance scheduling. A12. At most 14 hours per day with at least 16 hours of run time on the 2nd, 3rd, and 4th. Q13. Does NPS have a specific maximum decibel threshold for generator operation at this site (measured at a defined distance), or is compliance with the manufacturer's "super-silent/whisper-rated" designation sufficient? A13. Manufacturer's "super-silent/whisper-rated" designation is sufficient. Q14. Are there NPS-specific access requirements for contractor personnel at Mount Rushmore like background checks, vehicle passes, badging, or check-in procedures? A14. No additional background checks are needed at this time, but this is subject to change for any unforeseen circumstances. Q15. Is there a designated contractor staging and parking area on NPS grounds for delivery vehicles and equipment? Are there vehicle height or weight restrictions for accessing the site? A15. Lot 7 as indicated on the map in the Yellow box. Contractor responsible for verifying height and weight restrictions for route. Q16. Desired fuel: diesel or propane? A16. Diesel Q17. Runtime requi
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeWho won similar contracts
Recent government contract awards from the same buyer or for similar work. Public records from open.canada.ca, SAM.gov, and USAspending.gov.
A similar contract went to HDR ENGINEERING INC for $75,266 in 2026.
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000)C211
A similar contract went to FALLS LUMBER CO INC for $62,177 in 2026.
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000)5510
A similar contract went to HDR ENGINEERING INC for $29,779 in 2026.
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000)C211
A similar contract went to ADVANCED LOGISTIC PARTNERS INC for $425,000 in 2026.
INTERIOR, DEPARTMENT OF THE.NATIONAL PARK SERVICE.MWR MIDWEST REGION(60000)K045
Similar Tenders
OSP Uniform, Wallet, and Hat Badges (Price Agreement)
Department of State PoliceCloses July 7, 2026
84--COVERALLS,ANTI-EXPO
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.TROOP SUPPORT CLOTHING & TEXTILE.DLA TROOP SUPPORTCloses July 15, 2026
Bid No. 267070 Fire and EMS Uniforms
City of SalemCloses July 22, 2026
Public Notice RFP 26-02 Uniform Rental Contract
Southeastern Regional Transit AuthorityCloses August 21, 2026
Laundry Services
Los Angeles CountyCloses November 13, 2026