Full Description
CONTACT INFORMATION|4|N791.08|T1L|215-697-3765|michael.j.brown1069.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo||TBD|N00383|TBD|TBD|See Schedule|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250|||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A ||
The purpose of this amendment is to incorporate the following:
1.The new QTY for this requirement is 12
This RFQ/RFP is for repair requirement.
NAVSUP WSS requests that contractors submit a quote that includes either afirm-fixed price or TT&E pricing with estimate costs to repair thisitem.
Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset
at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular
businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain finalinspection and acceptance by the Government for all assets within the RTATsestablished in this contract.
Proposals shall reference the proposed RTAT and any capacity constraints.NAVSUP WSS requests that contractors submit a quote that includes either afirm-fixed price or TT&E pricing as well as estimate costs to repair thisitem.
This contract/delivery order/purchase order/modification is issued by theGovernment when deposited in the mail, transmitted by facsimile or sent by anyelectronic commerce method, including email. The Government's acceptance ofthe contractor's proposal constitutes
bilateral agreement to issue thiscontract/delivery order/purchase order/modification.
1. SCOPE
1.1 . Markings shall be in accordance with MIL-STD-130.
1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;CRYSTAL GROUP INC; drawing number ( ;1LTM5; ) ;CTL-00001REVA; , Revision ;latest; and all details and specifications referenced therein.
1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable
condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested
in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and
tested in accordance with the appro