Fabricate and Install New Structural Steel Flooring System at the Watervliet ...

Department
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC WVA
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed

Summary

DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC WVA is seeking Fabricate and Install New Structural Steel Flooring System at the Watervliet .... *** RESPONSE DATE HAS BEEN EXTENDED TO 11 MAY 2026 AT 2:30 P. Location: NY.

Full Description

*** RESPONSE DATE HAS BEEN EXTENDED TO 11 MAY 2026 AT 2:30 P.M. EST *** *** PLEASE NOTE THE RFI RESPONSES, SITE PICTURES, AND DRAWINGS THAT HAVE BEEN INCORPORATED *** --> ADDITIONALLY TAKE NOTE THAT: The LA-1050 Top Loading oven dimensions are: 69" x 97" x 60". Weight is 5,865 lbs. Contractor to provide the design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing of a new structural steel flooring system required to support manufacturing equipment in Building 35 at the Watervliet Arsenal (WVA). All work to be conducted in accordance with the Statement of Work (see section J of the solicitation). Wage Determination General Decision Number: NY2 Latest Reviison applies and is incorporated. Magnitude of the project is between $25,000 and $100,000. Period of performance is 90 days from issuance of Notice to Proceed. 100% Payment (and Performance if price is over $150k) bonds are required. Solicitation is set-aside for small business and will result in a firm fixed-price contract. Site visit will be conducted on 28 April 2026 @ 2:00pm. See page 3 of solicitation for further details.

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Similar Tenders