Installation of Styrene-Butadiene-Styrene (SBS) Modified Bitumen Roofing System

Department
Design and Construction
Country
United States
Closing Date
November 18, 2099(26846 days left)
Estimated Value
Not disclosed

Industries

Summary

Design and Construction is seeking Installation of Styrene-Butadiene-Styrene (SBS) Modified Bitumen Roofing System. The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor,. Location: NY. Closing date: November 18, 2099.

Full Description

The New York City (the City) Department of Design and Construction (DDC or the Department) is in the process of establishing a pre-qualified list (PQL) of contractors for furnishing all labor, materials and equipment, necessary and required to install a Styrene-Butadiene-Styrene Modified Bitumen roofing system such as Siplast P2030, GAF SBS Ruberoid Heat Weld, or approved equal for various capital construction projects. It is anticipated that the estimated construction cost for these types of roof projects will range from $100,000 to $10,000,000. https://www.nyc.gov/site/mocs/passport/getting-started-with-passport.page | Category: Construction/Construction Services | Method: Request for Qualifications

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Similar Tenders