DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMORE is seeking Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels…. The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore.

Full Description

The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 JULY 2026.

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Who won similar contracts

Recent government contract awards from the same buyer or for similar work. Public records from open.canada.ca, SAM.gov, and USAspending.gov.

A similar contract went to BERING STRAITS GLOBAL INNOVATIONS, LLC for $26,061,286 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMOREY1LB

A similar contract went to ALLISON PARK CONTRACTORS, INC. for $17,055,100 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMOREY1PZ

A similar contract went to NASCENCE GROUP LLC for $1,029,093 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMORES201

A similar contract went to HASTEN SERVICES LLC for $189,525 in 2026.

DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMORES201

Browse all recent awards →

Similar Tenders