Full Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE & RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9||||||||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
ROYALTY INFORMATION (APR 1984)|1||
TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A ||
ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||
THE PURPOSE OF THIS AMENDMENT IS TO INCREASE THE QTY ON PD N0038325U3502 FOR NIIN 015691186 TO A QTY OF 6.
THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE TOTAL QTY TO 25.
All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or
sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein.
Early and incremental deliveries accepted.
All terms and conditions are in accordance with BOA:N00383-22-G-SH01
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC: RACHEL.M.OPPERMAN.CIV@US.NAVY.MIL
\
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable
condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested
in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and
tested in accordance with the approved repair/overhaul manual listed in th