Full Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|SEE SPECIFICIATIONS SECTIONS C AND E |
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x||||||
STOP-WORK ORDER (AUG 1989)|1||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - CertificationsCombo - Receiving Report & Invoice - Material|TBD|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2||TBD|;N39040 - Certifications;|||;See DD 1423;||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
VALUE ENGINEERING (JUN 2020)|3||||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery|||||
SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4|||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||
PROGRESS PAYMENTS (DEVIATION 2026-O0022)(FEB 2026)|4|||||
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||
INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2|||
TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|FIRM FIXED PRICE|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1||
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE CLOSING DATE AND TIME AS INDICATED.
THE PURPOSE OF THIS AMENDMENT IS TO ANSWER CONTRACTOR QUESTIONS.
QUESTION:
The requirement for Grade A per MIL-PRF-32804. Is grade B acceptable for our submission?
ANSWER:
Yes, Grade A is required. This is a Level I/SUBSAFE part, so per the NAVSEA 06 letter on Level I requirements for WA-DED parts, Grade A is required.
QUESTION:
I wanted to confirm the quantity is for 1 CORD assembly 206-5 that includes the printed Body as well the other items (retaining ring, Screw Cap and Label Plate).
ANSWER:
The quantity is for 2, per page 2 of the solicitation. The component that is required and authorized to be additive manufactured is the body, piece 43A of Drawing 7549599. All parts of the CORD Assembly must be delivered (as assembled) per NAVSEA drawing
801-6640811 ASSY 206-5(L1).
QUESTION:
I didn't see anything in the SOW regarding shock and vibration. I just wanted to confirm that it was not required per the component specification or any other place.
ANSWER:
Shock/vibe are not required.
QUESTION: Is there a 3D model available (for example .stp or .stl or .prt file types)? ANSWER:
We do not have a model available.
\
1.This is a Level One Requirement. 2.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg.
3.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
4.This requirement requires the mandatory use of Additive Manufacturing for specific piece part components as outlined within the technical data package for this end item. As such, the vendor shall conform to all specifications of meeting both the piece part
conformance and the total end item specifications material, marking, testing and acceptance requirements.
5.Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See clause FAR 52.211-14, Notice of Priority Rating for National Defense,
Emergency Preparedness, and Energy Program Use.
6.The following proposed delivery schedule applies:
Submission of all certification data CDRLS 20 days prior to delivery.
PNSY review/acceptance of certification CDRLS 18 working days after receipt
Final delivery of material (200 days)
7.Partial and early delivery of requirement is authorized and desired and is at no additional cost to either the vendor or the Government.
8.NAVSUP WSS Mech will be considering past performance in the evaluation of offer