Hatch Stagefield Air Traffic Control Tower Equipment Movement
Department
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.FDO EUSTIS.W6QM MICC-FT RUCKER
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Summary
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.FDO EUSTIS.W6QM MICC-FT RUCKER is seeking Hatch Stagefield Air Traffic Control Tower Equipment Movement. 18 JUNE 2026 UPDATE: AMENDMENT 0001 HAS BEEN POSTED. Location: AL.
Full Description
18 JUNE 2026 UPDATE: AMENDMENT 0001 HAS BEEN POSTED. SEE ATTACHMENTS FOR FURTHER DETAILS. This non personal services requirement is being competed as a Firm Fixed Price 100% Total Small Business set aside, under NAICS 238210 and PSC N059. The contractor shall provide all personnel and supervision required to perform the de-installation of Air Traffic Control (ATC) equipment in the existing Air Traffic Control Tower (ATCT) at Hatch Stagefield, Fort Rucker, Alabama and the installation of the ATC equipment into newly constructed ATCT as per building design. Installation shall include all required cabling and grounding as specified in the appropriate regulations and standards FAA-STD-019e and MIL-STD-188-124(B).
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
59--FILTER,RADIO FREQUE
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA LAND AND MARITIMECloses July 6, 2026
58--DETECTOR,RADIO FREQ
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATIONCloses July 6, 2026
58--TELEPHONE
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.TROOP SUPPORT CONSTRUCTION & EQUIPMENT.DLA TROOP SUPPORTCloses July 6, 2026
59--FILTER,RADIO FREQUE
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA LAND AND MARITIMECloses July 6, 2026
59--ANTENNA
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA LAND AND MARITIMECloses July 6, 2026