Security fence at Coast Guard Air Station Clearwater Florida

Department
HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028)
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed

Summary

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028) is seeking Security fence at Coast Guard Air Station Clearwater Florida. 08/03/2026 Amendment A00002:  RFI #2 Q&A for fencing project: Please clarify the documents needed for proposal submission. Location: FL.

Full Description

08/03/2026 Amendment A00002:  RFI #2 Q&A for fencing project: Please clarify the documents needed for proposal submission. Is there an SF1442 form? No, please provide quote via email on company letterhead to Jerry.Lopez@uscg.mil Notice is SAM states “The GOVT will award … “Lowest Price, Technically Acceptable”.  Please confirm what technical information is required to be submitted with this proposal.  Technical proposal shall include vendors plan to perform work requested within SOW and if used, shall also include name of Sub-Contractor and subs past performance related to this type of work. SOW does not mention period of performance.  Please confirm the number of days all work is required to be completed within. To be completed within 30 days. Please confirm whether a signed and sealed as-built survey is required after construction is completed. Signed and sealed as-build survey not required. Please provide brand and model of new security camera or base standard to follow. Please provide a standalone security camera, or one incorporated into the keypad, with motion detection and memory card capability. No specific brand or model is required . During site walk, the existing fence had razor ribbon.  New razor ribbon is not mentioned in the SOW as part of the barbed wire.  Please confirm if this is required to be installed along with the 3 strands of straight barbed wire. The SOW has been updated and attached to this solicitation to include concertina wire on section A and B .  Existing chain link fence is 6’.  SOW states new fence is to be 8’.  Please confirm that the new fence is to be 8’ plus the height of the barbed wire (approximately 1 foot height) for a total of 9’.   The SOW has been updated. Sections A and B will match the existing height of 6 feet. The orange line, representing the back fence in Section C, will remain at 8 feet . Please confirm if any new signage required to be hung on the new fence or new gates as part of this SOW. No requirements from the contractor to install new signage.  Sow does not state what type of operator for the gate.  Please provide a make/model for the new operator.  The SOW states that a gate operator is required, including all materials necessary to complete the installation. The facility has 220/120 voltage available. A picture of the current gate operators at the facility is attached in a word document for reference. 07/29/2026 Amendment A0001:  RFI Q&A for fencing project. Demolition portion: Q: Will we be able to cut current posts off at ground level and leave in place, or would you like each of the posts and concrete removed and subsequently backfilled? A:  Post and concrete shall be removed and backfilled. Q: During existing fence removal, will there be anyone available to assist in moving vehicles away from fence?  It seems like some of them are very close and we want to take every precaution against damage. A:  The unit will make the notification to have the owner move their vehicles away from the fence.  These items will be coordinated during the preconstruction meeting after the project has been awarded. New Fencing: Q: There seems to be a small bridge at the corner of the lot.  Will the new fencing go past this in a straight line to a predetermined point on the existing fence? A: Enclosure 2, orange line (C) on the SOW: The new fence will not extend beyond the bridge; it will run straight across. Gates: Q: Gate A- ‎Currently seems to be a double mechanical gate - Swap to a sliding 26' powered gate.  A: That is correct. Q: Enclosure 3 on the pictures, lists that a mechanical cypher lock and camera are to be installed which differs from the scope of work.  Will gate-A have an electronic keypad at the entrance AND exit, and where will the camera be mounted and where does the camera feed need to go? A:  Camera will be mounted on the entrance of Gate A to capture vehicles coming in.  No camera will be used on gate C. Q: Gate  C - Proposing to create a 72" wide swing gate with mechanical cypher locks on each side to give enough space for the 60" mower requirement A:  Install a swinging gate with a minimum 60-inch opening and a cipher lock. Example attached sample picture in word document. End.. This combined synopsis/solicitation for construction services is prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only . This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 70Z02826Q0000102.  Applicable North American Industry Classification Standard (NAICS) codes are: 2

Get the next construction tenders in your inbox tomorrow morning. Free.

Who won similar contracts

Recent government contract awards from the same buyer or for similar work. Public records from open.canada.ca, SAM.gov, and USAspending.gov.

A similar contract went to IAGI INC for $36,998 in 2026.

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028)J041

A similar contract went to HII Mission Technologies Corp for $18,810 in 2026.

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028)U099

A similar contract went to HZ CONSTRUCTION INC for $33,925 in 2026.

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028)J046

A similar contract went to PIPE DREAMS MARINE LLC for $30,661 in 2026.

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE MIAMI(00028)8305