Full Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT|N/A|TBA|SPRMM1|TBA|TBA|TBA|TBA|TBA|TBA|TBA||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|X|X|X|||X||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|334419|750||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. All contractual documents (i.e. contracts, purchase orders, task orders,
Delivery orders, and modifications) related to the instant procurement are
considered to be "issued" by the government when copies are either deposited
in the mail, transmitted by facsimile, or sent by other electronic commerce
methods, such as email. The government's acceptance of the contractor's
proposal constitutes bilateral agreement to "issue" contractual documents as
detailed herein.
2. No drawings or technical data are available for this item.
3. RFID is only required if the Ship To code identified above is listed at the website with DFARS 252.211-7006 PASSIVE RFID, as the time of shipment.Currently, there are no locations listed that require passive RFID tagging.
4. When submitting quotes via EDI, make sure you specify any exceptions (i.e.
Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with a
hardcopy of the exceptions. If nothing is indicated or received, award will
be based upon solicitation requirements. Changes or requests for changes
after award will have consideration costs deducted on modifications.
5. If supplies will be packaged at a location different from the offeror
address, the offeror shall provide the name and street address of the
packaging facility.
Inspection of material will be at:
______________________________________________________________
Inspection of packaging and final acceptance of material will be at:
______________________________________________________________
Any order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the DETECTOR,RADIO FREQ .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The DETECTOR,RADIO FREQ furnished under this
contract/purchase order shall be the design represented by Cage Code(s)
reference number(s). Cage _______ ref. no. ;53711 7253186;
3.2 Marking - This item shall be physically identified in accordance
with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and
approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the
substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government
evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new.
Code 6: Part redesigned - Parts not interchangeable.
3.4 Electrostatic Discharge Control - The Contractor shall comply with the