Full Description
CONTACT INFORMATION|4|N774.7|BV3|771-229-0887|brian.j.cawley2.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
GENERAL INFORMATION-FOB-DESTINATION|1|A|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to brian.j.cawley2.civ@US.NAVY.MIL.
B. General Requirements: MIL-STD Packaging, Government Source Inspection Required.
C. All freight is FOB Origin.
D. This RFQ is for a BUY/Procurement. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
E. Only a Firm-Fixed Price (FFP) will be accepted.
F. Must adhere to IUID requirements of DFARS 252.211-7003
G. The ultimate awardee of the proposed contract action must be an authorized source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization.
H. Your quote should include the following information for justification purposes:
- New procurement unit price____________________
- Total Price _____________________
- Procurement delivery lead time (PTAT) _________________ days
- Award to CAGE _______________
- Inspection & Acceptance CAGE, if not at Award to CAGE _____________
- Cost breakdown requested, including profit rate (if feasible).
- Quote expiration date _______________ (90 Days minimum is requested).
- Delivery Vehicle (If Delivery Order requested)(e.g. if your CAGE has a current BOA/IDIQ)
I. Important Traceability Notice:
If you are not the manufacturer of the material you are offering, you must provide an official letter and/or email from the OEM confirming that your company is an authorized distributor of their items.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the VALVE, O2 ADD .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | |
DOCUMENT REF DATA=MIL-STD-1330 | | |D |960920|A| | |
DOCUMENT REF DATA=MIL-DTL-19595 | | |D |030211|A| | |
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The VALVE, O2 ADD furnished under this
contract/purchase order shall be the design represented by Cage Code(s)
reference number(s). Cage _______ ref. no. ;99251 6196153;
3.2 Marking - This item shall be physically identified in accordance
with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Production Lot Approval (Government Testing) - Production Lot Test and approval is required.
3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and
approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the
substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government
evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY