Full Description
CONTACT INFORMATION|4|N762.06|2B2|771-229-0565|jason.j.sklencar.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x||||||||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
ROYALTY INFORMATION (APR 1984)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.
1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.
Repair of:
VALVE,ELECTRO HYDRA ;1710-01-306-9485; NSN , ;6534D498-3; Part Number, Shall be performed IAW: VALVE,ELECTRO HYDRA ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. REVISION J.;
Publication (s).
1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and
recommendations via form 1998.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable
condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested
in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and
tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).
3.3 3.0 SCOPE
3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,
including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and
shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.
3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary
facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:
VALVE,ELECTRO HYDRA ;6534D498-3; P/N, ;1710-01-306-9485; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.REVISION J.;
Tech Publications
3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repai