NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Department
AGRICULTURE, DEPARTMENT OF.FARM PRODUCTION AND CONSERVATION BUSINESS CENTER.FPAC BUS CNTR-ACQ DIV
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Summary
AGRICULTURE, DEPARTMENT OF.FARM PRODUCTION AND CONSERVATION BUSINESS CENTER.FPAC BUS CNTR-ACQ DIV is seeking NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam. Please see Attachment 1 Specificaitons document for further details. Location: MA.
Full Description
Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27ᵗʰ at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
Plympton Water Security Study- Request for Proposal
Old Colony Planning CouncilCloses May 20, 2026
Wilmington Waterfront Park West End Restroom & Site Restoration
Harbor Department, Port of Los AngelesCloses May 20, 2026
15--PLATE,STRUCTURAL,AI
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATIONCloses May 21, 2026
15--PANEL,STRUCTURAL,AI
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATIONCloses May 21, 2026
Jackson & Public Wks Sewer Lift Station In-Kind Replacement of Pump & Controls
Town of FranklinCloses May 21, 2026