Y1DA--NRM-CONST 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear
Department
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.242-NETWORK CONTRACT OFFICE 02 (36C242)
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Summary
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.242-NETWORK CONTRACT OFFICE 02 (36C242) is seeking Y1DA--NRM-CONST 630A4-17-433 Replace Boiler Plant Main Electrical Switchgear. Updated VA Response States: Please be advised that no pre-demolition hazardous materials survey has been performed for asbestos, etc.
Full Description
61. Updated VA Response States: Please be advised that no pre-demolition hazardous materials survey has been performed for asbestos, etc. Accordingly, each bidder shall include a reasonable allowance based on construction perimeter or square foot in their bid for all necessary hazardous materials survey, sampling, testing, and abatement services required to complete the work in compliance with applicable codes and regulations. This allowance shall cover, at a minimum, the costs for engaging qualified environmental consultants conducting field investigations and sampling, laboratory analysis, and performing any required abatement, removal, handling, and proper disposal of identified hazardous/regulated materials encountered within the demolition and construction areas.
Concentric Questions:
The above response is not acceptable. Not knowing the quantity or any scope of the abatement work, how can the contractor come up with an allowance or price?
Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor.
If the agency is unsure about the abatement scope of work, we request that the agency provide a fixed allowance amount for all abatement work in the bid so that all bidding contractors use the same information/allowance amount.
Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor.
Providing a fixed allowance amount for all the listed abatement work in the bid will ensure a fair, reasonable, and competitive offer to the government. Updated VA Response: To ensure fairness for all parties, the abatement allowance will be included as an open line item for the awarded contractor.
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
TTUS Construction Manager-Agent (CMA) 3 Year Pre-Qualification 2026-2029 RFQ
768Closes May 26, 2026
LACDA26-055 - SENIOR GRANT PROGRAM CONSTRUCTION REHABILITATION SERVICES-SG22-...
Los Angeles CountyCloses May 26, 2026
Owner's Representative RFQ
Lacey Fire District 3Closes May 26, 2026
On Call Construction Estimating
Seattle Housing AuthorityCloses May 26, 2026
VET SERVICE FOR LEC
Department of AgricultureCloses May 27, 2026