PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY W...
Department
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Summary
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.SCO ALEXANDRIA.SUPPORT CENTER HUNTSVILLE.W2V6 USA ENG SPT CTR HUNTSVIL is seeking PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY W.... The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. Location: VA.
Full Description
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
82626B0032-BWT-1653-FAS MAINT., REPAIR OF FIRE ALARM & FIRE SPPR SYS AT VAR. ...
Environmental ProtectionCloses May 28, 2026
E22CN09 Mystic Junction, Chestnut St and Washington St Environmental Remediat...
Massachusetts Bay Transportation AuthorityCloses May 28, 2026
C&P 4 AG Wells, Allegheny & Westmoreland Cnty
Department of Environmental ProtectionCloses May 28, 2026
AMRP Hyde Lk S Horton Twp Elk Cnty
Department of Environmental ProtectionCloses May 28, 2026
Water Treatment Services for School Cooling Towers
EducationCloses May 28, 2026