B-198 HVAC Replacement at NSWC Crane, IN

Department
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed

Summary

The US Army Corps of Engineers is gauging small business interest for a 30,000 SF HVAC replacement in Building 198 at NSWC Crane, IN. Scope includes new chillers, equipment pads, and humidity control (45-60% RH) for an Ordnance Prototype Development facility, with related work in adjacent buildings 2507 and 2508.

Full Description

A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business and you are interested in this project please respond appropriately. Project Location: NSWC Crane, IN Project Description:   This project will replace the HVAC system for building 198. The total SF of the project will be 30,000 SF.  NSWC Code WXR is required to perform operations in a window of 40-60 percent humidity.  The low end is a static issue and on the upper end it become a quality issue.  NSWC Code WXR work requirements entail test cells, work bays, independently-controlled vent hoods, humidity 45% to 60% RH in all bays and cells, and a secure cell.  Building 198 is an Ordnance Prototype Development facility supporting Ammunition, Explosives & Toxic Laboratory research, development, test, and evaluation mission of the Naval Surface Warfare Command (NSWC) at NSA Crane. The renovation work and scope are primarily inside existing building 198 with additional internal work to the adjacent supporting buildings 2507 and 2508. Existing chiller pads will be reused for the new chillers, with the equipment pad near Building 2507 being extended 3-feet to accommodate new structural elements. New equipment pads located between Building 198 and 2507 will be constructed for pad mounted exhaust fans, and a new transformer pad will be constructed near the existing transformer pad. Contract duration is estimated at 270 calendar days. The estimated cost range is between $5,000,000 and $10,000,000.  NAICS code is 236220.  All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service Disabled Veteran Owned Business contractors should respond to this survey by Monday, May 11, 2026 by 10:00 AM Eastern Time. Responses should include: Identification and verification of the company’s small business status. Contractor’s Unique Entity Identifier (UEI) and Cage Code. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. Description of Experience – Provide descriptions on up to three (3) projects completed by you as the prime contractor or if the offeror is a Small Business, they can provide Past Performance of affiliates in accordance with DFARS 215.305(a)(2)(C). Submissions of Past Performance from affiliates shall include documentation of the affiliation to the offeror. To be relevant the projects submitted should be greater than 95% construction complete or completed within the last 5 years and are similar to this project in scope and complexity. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects.  Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. CMMC Certification Level. a. Projects similar in Scope to this project include: Projects considered similar to this project include but are not limited to building HVAC upgrades which include replacement of air handling units, makeup air units, VAV repairs, chilled water plants and DDC HVAC control systems including all appurtenances.  b. Projects similar in size to this project include: Major construction projects of approximately 10,000 SF or greater. c. Based on definitions above, for each project submitted include: Current percentage of construction complete and the date when it was/ will be completed.   Size of the project Scope of the project The dollar value of the construction contract The portion and percentage of work that was self-performed. Describe the work your company self-performed. Must be at least 15% self-per-formed. Whether the project was design build or design/bid/build Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under Revolutionary Federal Acquisition Regulation Overhaul (RFO) clause 52.219-14, Limitations on Subcontracting (01 Feb2026); they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Survey Form can be accessed at https://forms.osi.apps.mil/r/tdQWYLfTXU or via the

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Similar Tenders