Full Description
CONTACT INFORMATION|4|N723.18|B5W|1-771-229-3241|sara.m.weinert3.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELIVERY OF UNIT|45 DAYS FROM WHEN DEFECT WAS FOUND|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
ROYALTY INFORMATION (APR 1984)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x|
This solicitation is for the repair of the items identified herein. These items are covered against Basic Ordering Agreement (BOA) N00383-24-G-B601:
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Required RTAT: 110 days after receipt of asset
Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:
A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the
Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile,
or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted.
All Terms and Conditions are in accordance with BOA: N00383-24-G-B601.
\
1. SCOPE
1.1 . Markings shall be in accordance with MIL-STD-130.
1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;GE AVIATION SYSTEMS LLC; drawing number ( ;35351; ) ;185019-001; , Revision ;Latest; and all details and specifications referenced therein.
1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria