********************************************* 14 May 2026 UPDATE Bid opening held on 8 May 2026. The abstract of bids received is attached.. ********************************************** 20 April 2026 - UPDATE Bid due date extended to 8 May 2026 ************************************************ 8 April 2026 - UPDATE Firms advancing to Step 2: Dean Kurtz Construction, 1651 Rand Road, Rapid City, SD 57702 Engineering & Construction Innovations, Inc (ECI)., 7002 6th Street, Oakdale, MN 55128 Greenstone Construction, Inc., 2631 12th Ave S, Suite B, Fargo, ND 58103 Sentry, 1928 Calvin DR, Watertown, SD 57201 ************************************************ 5 Feb 2026 - UPDATE: To confirm intent to attend the Site Visit on 10 Feb, please email Cody Nickolas at cody.j.nickolas@usace.army.mil and copy jeffrey.w.wyant@usace.army.mil and sam.k.mcguffey@usace.army.mil. ************************************************* Construct wet well, water intake, and pump house at Lake Sharpe, Fort Thompson, SD in accordance with the incorporated specifications and drawing sheets. The U.S. Army Corps of Engineers (USACE) Omaha District is issuing a Two-Step Invitation for Bid (IFB) following FAR Part 14.5. The solicitation will result in one (1) Firm Fixed-Price contract for installing a new raw water intake system and constructing a new pump house on Lake Sharpe at Fort Thompson in South Dakota. This solicitation is Set-Aside to SMALL BUSINESS FIRMS. Contractors must be registered and have active and verified accounts in both the System for Award Management (SAM) to receive a contract award from any DoD activity. Contractors may access the website SAM.gov at https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS Code 237990 Other Heavy and Civil Engineering Construction is included in their profile prior to submission of offer. The current size standard is $45,000,000.00. Site Visit: A site visit is planned for Tuesday, 10 February 2026. The details are in clause 52.236-27 and its alternate on pages 12 and 13 of the soliciation. The estimated magnitude of construction is between $5,000,000 and $10,000,000. Invitation For Bid (IFB) Evaluation Criteria: This solicitation and resulting contract are using a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. The two-step procedure is a combination of competitive procedures designed to obtain the benefits of sealed bidding while ensuring only technically acceptable firms participate in the priced sealed bid. The process allows for the Step One technical proposal submission and evaluation to be performed to identify firms eligible for Step Two. Step One ensures that only technically acceptable firms participate in the Step Two sealed bid process. Contractors participating in the solicitation will submit technical requirements in accordance with the solicitation, Section 00 22 00 EVALUATION CRITERIA for Step 1. Submissions will be evaluated for acceptability considering technical elements for evaluation. The submission requirements of Step One, Request for Technical Proposal, shall not include any prices or pricing information. Bid bonds / guarantees are not required to be submitted with the Step One technical proposal. Under this bidding process, Step One consists of the request for submission, evaluation and (if necessary) discussion of a technical proposal. Only one (1) technical proposal may be submitted by each offeror. The proposals will be evaluated for technical acceptability. Again, the technical proposal must not include prices or pricing information. A notice of “acceptable” or “unacceptable” will be forwarded to each Step One offeror upon completion of the technical proposal evaluation and final determination. The names of the offerors that submitted acceptable technical proposals will be listed on the Government’s https://sam.gov/ website for the benefit of prospective subcontractors. In Step Two, an amendment to the solicitation will be issued along with any updates to the technical specifications and construction drawings to only those bidders whose technical proposals are determined to be acceptable in Step One. The normal sealed bidding process in FAR Part 14 will be followed in Step Two. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions for Step One, will be considered for award. Each bid in Step Two must be based on the bidder's own technical proposal that was submitted, evaluated and determined to be acceptable in Step One. Bidders must comply with the 100% technical specifications and construction drawings and the bidder’s acceptable technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission. Payment and Performance Bonds will be required for the full amount
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
Plympton Water Security Study- Request for Proposal
Old Colony Planning CouncilCloses May 20, 2026
Wilmington Waterfront Park West End Restroom & Site Restoration
Harbor Department, Port of Los AngelesCloses May 20, 2026
15--PLATE,STRUCTURAL,AI
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATIONCloses May 21, 2026
15--PANEL,STRUCTURAL,AI
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA AVIATION.DLA AV RICHMOND.DLA AVIATIONCloses May 21, 2026
Jackson & Public Wks Sewer Lift Station In-Kind Replacement of Pump & Controls
Town of FranklinCloses May 21, 2026