Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection an...

Department
HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE KETCHIKAN(00035)
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed

Summary

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.BASE KETCHIKAN(00035) is seeking Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection an.... This solicitation for commercial services is prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12. Location: AK.

Full Description

This solicitation for commercial services is prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.201, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.  The U.S. Coast Guard (USCG) Base Ketchikan has a requirement for annual inspection, testing, and certification for its potable water system backflow preventers. The contractor shall provide all personnel, labor, materials, equipment, tools, supervision, and transportation necessary to perform the work as detailed in the attached Performance Work Statement (PWS).  This procurement is a total small business set-aside under NAICS Code: 238220 - Plumbing, Heating, and Air-Conditioning Contractors. The small business size standard is $19.0 million.  (The full) Performance Work Statement is attached to this solicitation package and provided below:  Base Ketchikan Potable Water System Backflow Preventer – Annual Inspection and Testing  1.0 GENERAL  1.1 Background: United States Coast Guard (USCG) Base Ketchikan requires annual inspection, testing, and certification for its potable water system backflow preventers to ensure compliance with federal and local regulations, maintain system integrity, and protect the health and safety of base personnel.  1.2 Scope: The Contractor shall provide all necessary equipment, labor, materials, and supervision to perform annual inspection, testing, certification, and reporting for all backflow prevention assemblies listed in this PWS. This is a non-personnel services contract. The Government will not exercise any supervision or control over the contract service providers.  1.3 Objective: The objective of this contract is to ensure all backflow prevention assemblies at USCG Base Ketchikan are functioning correctly, are certified in accordance with all applicable standards, and that any deficiencies are documented and reported to the Government for corrective action.  1.4 Applicable Documents:  Manufacturers’ Specifications for each backflow preventer.  Ketchikan Municipal Code.  NFPA 25: Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.  2.0 SPECIFIC REQUIREMENTS/TASKS  The Contractor shall perform the following tasks for all backflow preventers listed in Paragraph 2.1.  2.1 Task One: Inspection and Testing. The Contractor shall conduct annual inspection and testing on all backflow prevention assemblies listed below.  2.1.1 Equipment List:  | Location | Brand | Size |    | Hard Pier | Watts 909 | 2.5" |  | Hard Pier | Watts 909 | 2.5" |  | Hard Pier | Watts 909 | 2.5" |  | IPF North Shop | Watts 909 M1 QT | 2" |  | IPF North Shop | Watts 909 M1 QT | 2" |  | IPF Boiler Room | Watts 007M3 QT | 3/4" |  | STA Boat House | Watts 909 M1 QT RP | 1.5" |  | STA Boat House | Watts 009 QT RP | 3/4" |  | Admin Boiler Room | FEBCO 825Y | 1" |  | North Shop Industrial | Watts 007 M1 QT | 2" |  | Warehouse Boiler room | FEBCO | 1.5" |  | MAT Boiler Room | AMGS COLT 200 DC | 6" |  | Medical Boiler | Watts LF 009 M2 QT | 1.5" |  | Medical Boiler | Watts LF 009 M3 QT | 3/4" |  | Galley Boiler | Watts LF 009 M2 QT | 1" |  | UPH Boiler | Watts LF 009 M3 QT | 3/4" |  | FRC Pier Supply | Watts | 4" |  | Hard Pier #3 | Watts | 2.5" |  | Lower Base Main | Wilkins | 6" |  | ADMIN Sprinkler | AMES | 6" |  | PIER #2 | Watts | 1.5" |  | Lower Station Boat House | Watts | 2" |  2.2 Task Two: Reporting. The Contractor must provide a detailed report of the work performed.  2.3 Task Three: Deficiency Quoting. For any assembly that fails inspection or is found to be deficient, the Contractor must provide a written quote for the necessary repairs.  3.0 CONTRACTOR PERSONNEL  3.1 Qualified Personnel: The Contractor must provide certified and qualified personnel to perform all requirements specified in this PWS. The Contractor must provide proof of technician certification/license to the Technical POC (POC) upon request and include it with the final report deliverable.  4.0 OTHER APPLICABLE CONDITIONS  4.1 Period of Performance: The period of performance is a base period with four (4) one-year option periods.  Base Period: July 1, 2026, through September 30, 2026  Option Period One: July 1, 2027, through September 30, 2027  Option Period Two: July 1, 2028, through September 30, 2028  Option Period Three: July 1

Want tenders like this emailed daily?

Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.

Sign Up Free

Similar Tenders