Full Description
CONTACT INFORMATION|4|N741.4|AV0|7712290413|LAMAR.R.CRUMMEL.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. WHEN SUBMITTING QUOTES, MAKE SURE YOU SPECIFY ANY EXCEPTIONS, I.E. MIL-STDPACKAGING, MIL-STD LABELING, INSPECTION AND ACCEPTANCE LOCATIONS, PACKAGINGHOUSES, SURPLUS MATERIAL, ETC. IF NO EXCEPTIONS ARE INDICATED OR RECEIVED,AWARD WILL BE BASED UPON SOLICITATION
REQUIREMENTS. CHANGES OR REQUESTS FORCHANGES AFTER AWARD WILL HAVE CONSIDERATION COSTS DEDUCTED FROM UNIT PRICE.
2. IF SUPPLIES WILL BE PACKAGED AT A LOCATION DIFFERENT FROM THE OFFERORADDRESS, THE OFFEROR SHALL PROVIDE THE NAME, STREET ADDRESS AND CAGE CODE OFTHE PACKAGING FACILITY.
3. PLEASE DO NOT INCLUDE SHIPPING COSTS. SHIPPING/TRANPORTATION ASSITANCE WILL BE IN ACCORDANCE WITH WSSTERMFZ02.
4. SOURCE INSPECTION IS REQUIRED FOR THIS ITEM. PLEASE PROVIDE ANY ADDITIONALCOSTS ASSOCIATED WITH SOURCE INSPECTION INTO YOUR UNIT PRICE.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the RUGGED FLAT PAN DSP .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
;The following controller shall be used to build the SSGN/SSBN flat panel display:ELO E658721 Controller-2216 Accutouch Resistive Controller. This part is required to complete a successful PM15XG-3D-EB3V2 build. Without the ELO E658721 controller this part is
essentially worthless.;
3.1 Cage Code/Reference Number Items - The RUGGED FLAT PAN DSP furnished under this
contract/purchase order shall be the design represented by Cage Code(s)
reference number(s). Cage _______ ref. no. ;5ACD8 PM15XG-3D-EB3V2;
3.2 Marking - This item shall be physically identified in accordance
with ;MIL-STD-130, REV N, 16 NOV 2012; .
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and
approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the
substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government
evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new.
Code 6: Part redesigned - Parts not interchangeable.
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable