Who Won W6QK ACC WVA Contracts?
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-DTA.W6QK ACC WVA
34 contract awards from W6QK ACC WVA on public record — the winning suppliers, contract values, and award dates, free to search with no account required.
34
Awards on file
$14,670,953
Total recorded value
$102,980
Median contract value
Top suppliers
- DMYLES INC.5 awards
- DYNASTY CHEMICAL CORP4 awards
- CHESHIRE TOOL CO3 awards
- ABRASIVE-TOOL COMPANY LLC2 awards
- T & T MATERIALS INC2 awards
Recent W6QK ACC WVA awards
| Supplier | Contract | Value | Year |
|---|---|---|---|
| BLANCHARD INDUSTRIAL SUPPLIES, INC. | Heat Treat Fixture for the Watervliet Arsenal | $107,122 | 2026 |
| ACCRABOND CORP | Chrome Stripping Salts for the Watervliet Arsenal | $44,608 | 2026 |
| BOURN & KOCH, INC. | Customized Machine Base for Cannon Manufacturing Process Equipment for the Watervliet Arsenal | $1,464,537 | 2026 |
| WINGATE ALLOYS INC | 13.5" OD 4340 Per A322 for the Watervliet Arsenal | $81,005 | 2026 |
| MID-STATE INDUSTRIES, LTD. | ROOF INSPECTIONS AND MAINTENANCE @ WATERVLIET ARSENAL | $605,000 | 2026 |
| TBG EE JV II, LLC | Crane Footing and Structural Steel Removal at Watervliet Arsenal Building 120 West Loading Dock | $68,853 | 2026 |
| CHESHIRE TOOL CO | Award Notice: Unilock Base Station for the Watervliet Arsenal | $56,634 | 2026 |
| DYNASTY CHEMICAL CORP | Electropolish WA for the Watervliet Arsenal | $89,913 | 2026 |
| TRISTATE CRATING & PALLET CO. INC. | CONTAINERS FOR WATERVLIET ARSENAL | $72,320 | 2026 |
| ABRASIVE-TOOL COMPANY LLC | Royal Products | $48,291 | 2026 |
| DMYLES INC. | Reactive Services and Spare Parts To cover the cost of all material, labor, and equipment to perform Remedial/Emergency Repairs in accordance with Scope of Work at the Watervliet Arsenal, Watervliet NY. | $1,950,000 | 2026 |
| DYNASTY CHEMICAL CORP | Honing Oil- Houghton Wiolan SH-10 for Watervliet Arsenal | $89,925 | 2026 |
| THREE D RIGGING & CONSTRUCTION, INC | Rigging Services to move 36 old Rotary Forge Boxes from Building 135 to laydown area and from laydown area onto trucks, at the Watervliet Arsenal, Watervliet NY | $337,160 | 2026 |
| DYNASTY CHEMICAL CORP | Honing Oil- Houghton Wiolan SH-10 | $89,925 | 2026 |
| H & C TOOL SUPPLY CORP. | Award Notice: KENNAMETAL EXTRUDE HONE MEDIA, for the Watervliet Arsenal | $48,671 | 2026 |
| AMERICAN MAINTENANCE & SUPPLIES, INC | REMOVE & REPLACE WINDOWS AT BUILDING 40-3 AT WATERVLIET ARSENAL | $157,306 | 2026 |
| T & T MATERIALS INC | Custom 465 for Watervliet Arsenal | $125,424 | 2026 |
| DMYLES INC. | VARIOUS BUILDING REPAIRS, FLOORING & FURNITURE RELOCATION | $343,137 | 2026 |
| BLASCO CONSTRUCTION CORP | 2026 Janitorial Services at the Watervliet Arsenal, Watevliet, NY. | $5,499,192 | 2026 |
| CROW PRECISION COMPONENTS, LLC | Award Notice: Crank Forging, per Drawing # 8768783DF, Revision V, for 155MM M284 Cannon, for the Watervliet Arsenal | $165,037 | 2026 |
Data sources: open.canada.ca Proactive Disclosure of Contracts, SAM.gov, and USAspending.gov. Refreshed nightly. Page data regenerated 2026-06-12.
Spotted an error? Email jason.n@govbid.ca.