N041--460-26-010|Lab and NFS Walk-in Refrigerator Refurbishment
Department
VETERANS AFFAIRS, DEPARTMENT OF.VETERANS AFFAIRS, DEPARTMENT OF.244-NETWORK CONTRACT OFFICE 4 (36C244)
Country
United States
Closing Date
Not specified
Estimated Value
Not disclosed
Industries
Summary
The U.S. Department of Veterans Affairs (244-Network Contract Office 4 (36C244)) is seeking proposals for 010|Lab and NFS Walk-in Refrigerator Refurbishment. Page 3 of 3
Project No 460-26-010 | Lab and NFS Walk-in Refrigerator Refurbishment
Construct Chiller Plant SET-ASDIE 100% FOR SERVICE-DISABLED VETERAN-OWNED BUSINESS ACQUISITION INFORMATION: In.
Full Description
Page 3 of 3
Project No 460-26-010 | Lab and NFS Walk-in Refrigerator Refurbishment
Construct Chiller Plant SET-ASDIE 100% FOR SERVICE-DISABLED VETERAN-OWNED BUSINESS ACQUISITION INFORMATION: In accordance with FAR Subpart 5.2 THIS OPPORTUNITY is 100% set-aside for Service-Disabled Veteran-Owned Businesses (SDVOSB) Contractors. This acquisition is conducted in accordance with FAR Part 36 & 14, Invitation for Bid (IFB). Award will be made based on Price only IAW FAR 14 Invitation for Bid procedures. Work to be Performed: -- Services --
PROVIDE:
Professional construction services to replace refrigeration system components to ensure reliability, compliance, and operational continuity for the Kitchen, Canteen, and Lab walk-in cold storage units at the Wilmington, Delaware VA Medical Center. -- Project Scope --
GENERAL:
The Wilmington, Delaware VA Medical Center operates 4 walk-in refrigerators and 3 freezers in the Kitchen/Canteen, and 1 walk-in refrigerator in the Lab walk-in cold storage units. Systems are showing age-related performance and reliability concerns necessitating assessment and replacement of all system components excluding the walk-in insulated panels.
SPECIFICS:
The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the project as indicated above. Demolition and replacement of the existing fridge/freezer components shall be included with the exception of the walk-in insulated panels.
Removal of current condensing units, evaporators, and line sets. This is not an all-encompassed list. (A crane may be needed for the removal and installation of the condensing units). Installation should include but not limited to new condensing units, evaporators, and line sets for each individual walk-in system.
Installation of all necessary electrical controls, including thermostats, defrost controls, fan controls, safety switches, and associated wiring required for the proper operation of each independent refrigeration system. This is not an all-encompassed list.
Installation of new door seals on all walk-ins.
Contractor shall replace damaged flooring in walk-ins 1328, 1328A, 1330, 1330A, 1314, and 1314A.
Contractor shall intergrate the new walk-in controls with our building automation systems to be monitored on the front-end system.
Contractor shall remove/add additional condenser pads as required. Contractor shall perform all work during the hours of 7:00 pm 5:30 am. Weekends if necessary.
If phasing is required, all work shall be coordinated to minimize disruption to daily functions of the VA campus. Construction activity shall involve all disciplines listed above. All employees of the general contractor and subcontractors shall comply with the VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
The general contractor shall implement the requirements of the VA Infection Control Risk Assessment (ICRA) team, including the establishment and maintenance of a dust control program. Prior to the start of work, the general contractor must prepare a plan detailing project-specific dust protection measure, including periodic status reports, and submit to the COR and Facility ICRA team for review.
Submission of a bid is a representation that the bidder has thoroughly investigated general and local site conditions and is satisfied as to the conditions to be encountered, while accomplishing work at the site. All work shall be performed in accordance with the Specifications and Drawings, and shall follow all applicable Federal, State and Local regulations and standards. The maximum time for completion of the project is 180 calendar days after receipt of Notice to Proceed. The full detailed scope of work will be included in the solicitation. The solicitation documents, drawings, and specifications will be available for download from the website https://beta.sam.gov/, SAM.gov, on or about June 5th, 2026. Potential bidders are responsible for monitoring this site for the release of the solicitation package and any other pertinent information and updates. The Government will not provide paper copies of the solicitation. Bidders will be responsible for downloading their own copy of the solicitation package, drawings, and subsequent amendments, if any. Telephone, written, facsimile, or e-mail requests for the solicitation will NOT be honored. Individual copies of the Bidder s Mailing List WILL NOT be prepared nor distributed by the Contracting Officer. The solicitation amendments issued to the IFB will be posted to SAM.gov website and bidders are advised it is their responsibility to obtain and acknowledge all amendments. Paper copies of amendments will NOT be individually mailed.
The solicitation will include the scheduled pre-bid organized site visit information, due date for contractor questions and bid due date. While the walk-thru is not mandatory, all bidders, suppliers and su
Want tenders like this emailed daily?
Get matched government contracts for your industry every morning. Free forever, with plain-English summaries and direct bid links.
Sign Up FreeSimilar Tenders
TTUS Construction Manager-Agent (CMA) 3 Year Pre-Qualification 2026-2029 RFQ
768Closes May 26, 2026
LACDA26-055 - SENIOR GRANT PROGRAM CONSTRUCTION REHABILITATION SERVICES-SG22-...
Los Angeles CountyCloses May 26, 2026
Owner's Representative RFQ
Lacey Fire District 3Closes May 26, 2026
On Call Construction Estimating
Seattle Housing AuthorityCloses May 26, 2026
VET SERVICE FOR LEC
Department of AgricultureCloses May 27, 2026